公眾號:mywangxiao
及時(shí)發(fā)布考試資訊
分享考試技巧、復(fù)習(xí)經(jīng)驗(yàn)
新浪微博 @wangxiaocn關(guān)注微博
聯(lián)系方式 400-18-8000
為了幫助考生系統(tǒng)的復(fù)習(xí)國際商務(wù)師考試 課程全面的了解國際商務(wù)師考試的相關(guān)重點(diǎn),小編特編輯匯總了 2011年國際商務(wù)師考試相關(guān)資料,希望對您參加本次考試有所幫助??!
quantity of customs count
會(huì)計(jì)師盤,點(diǎn)數(shù)量
the first page第一聯(lián)
filed by accounting department for reference會(huì)計(jì)部存查
end-user/using unit(department)使用單位
summary of year-end physical inventory bills
年終盤點(diǎn)截止單據(jù)匯總表
bill name單據(jù)名稱
This sheet and physical inventory list will be sent to accounting
department together (Those of NHK will be sent to financial
department)
本表請與盤點(diǎn)清冊一起送會(huì)計(jì)部-(NHK廠區(qū)送財(cái)會(huì)部)
Application status records of year-end physical inventory List and
physical inventory card 年終盤點(diǎn)卡與清冊使用-狀況明細(xì)表
blank and waste sheet NO.
空白與作廢單號
plate電鍍
mold成型
material for engineering mold testing工程試模材料
not included in physical inventory不列入盤點(diǎn)
sample樣品
incoming material to be inspected進(jìn)貨待驗(yàn)
description品名
steel/rolled steel鋼材
material statistics sheet
物料統(tǒng)計(jì)明細(xì)表
meeting minutes會(huì)議記錄
meeting type 會(huì)別
distribution department分發(fā)單位
location地點(diǎn)
chairman主席
present members出席人員
subject主題
conclusion結(jié)論
decision items決議事項(xiàng)
responsible department負(fù)責(zé)單位
pre-fixed finishing date預(yù)定完成日
approved by / checked by / prepared by核準(zhǔn)/審核/承辦
PCE assembly production schedule sheet
PCE組裝廠生產(chǎn)排配表
model機(jī)鍾
work order工令
revision版次
remark備注
production control confirmation生產(chǎn)確認(rèn)
checked by初審
approved by核準(zhǔn)
department部門
相關(guān)內(nèi)容:
2011年國際商務(wù)師考試商務(wù)英語考前輔導(dǎo)匯總
2011年國際商務(wù)師考試?yán)碚撆c實(shí)務(wù)全真模擬題匯總
編輯推薦:
2011年商務(wù)師考試網(wǎng)絡(luò)課堂培訓(xùn)免費(fèi)試聽
(責(zé)任編輯:中大編輯)